Before installation, make sure all necessary materials and tools are complete, including: Vinyl sheet piling boards, connecting locks, hammer or vibrating pile drivers, guide piles and support frames, and safety protection equipment for construction workers.
Construction site survey and planning
Determine the soil conditions of the construction area and evaluate whether additional foundation reinforcement is required.
Plan the piling line to ensure the straightness and stability of the wall.
Calculate the required sheet length and quantity to avoid material waste.
Installation steps of Vinyl Sheet Piling
Setting guide piles
The purpose of the guide piles is to ensure the precise alignment of the Vinyl sheet piling and reduce errors. Usually, wooden piles or steel piles can be used as temporary supports.
Insert Vinyl Sheet Piling step by step
Choose a suitable starting point for installation and securely fix the first piece of Vinyl sheet piling.
Use the lock connection method to insert the next sheet into the lock of the previous sheet.
Tap gently with a light vibrator or rubber hammer to ensure that the joint is tight.
Use a pile driver for deep installation
Use a vibrating pile driver or hydraulic hammer to drive the sheet into the ground to ensure that the designed depth is reached.
During the construction process, check the verticality of the wall at any time and adjust it if necessary.
Top reinforcement and finishing
After the construction is completed, install a reinforcement beam or cover plate on the top of the wall to improve the overall strength.
Clean up the site to ensure the safety of the construction area.
Construction precautions
Ensure construction safety
Construction workers must wear protective equipment such as safety helmets, gloves, and goggles.
During the construction process, ensure that the equipment operators are professionally trained.
Adapt to different soil conditions
For soft soil, foundation reinforcement can be carried out first, such as pouring concrete or setting reinforcement piles.
When encountering hard strata, pre-drilling can be done first to reduce the difficulty of construction.